读知识>英语词典>written report翻译和用法

written report

英 [ˈrɪtn rɪˈpɔːt]

美 [ˈrɪtn rɪˈpɔːrt]

书面报告,报告书

经济

英英释义

noun

  • a written document describing the findings of some individual or group
    1. this accords with the recent study by Hill and Dale
    Synonym:reportstudy

双语例句

  • Findings in the form of a written report will present customers.
    调查结果会以书面报告的形式呈递客户。
  • The tenderer shall, pursuant to the written report on bid assessment given by the bid assessment committee, determine the winning bidder from among the candidate winning bidders recommended by the bid assessment committee.
    招标人根据评标委员会提出的书面评标报告和推荐的中标候选人确定中标人。
  • The main project will be a10-12 page written report based on original economic research that you perform over the course of the semester.
    主要专题将是根据你在这个学期课堂内完成的原始经济研究中,所撰写出的十至十二页研究报告。
  • There will be a brief oral and written report due in the second class based on your fact-finding.
    第二次课,在你们事实发掘的基础上,做一个简短的口头和书面报告。
  • I was expected to send in a written report every two months.
    上面要我每两个月递交一份书面报告。
  • An objective, third party review of your software resulting in a comprehensive written report identifying issues and making recommendations.
    将针对您的软件出具一份客观的第三方审查报告,以书面方式详细报告发现的问题并提出建议。
  • Teams will document their efforts in a written report and make a formal presentation of their results.
    团队需要提交纪录专案过程的书面报告,并正式报告专案结果。
  • In this event, Customer's obligation to pay service fees with respect to any such Product shall terminate at the end of the month in which ABC receives such written report.
    针对此类事件,ABC将于收到书面报告的当月月底终止客户对此类产品相关的维修费支付义务。
  • In addition to the written report, Amtrak shall submit the track geometry data measured during the most recent track geometry inspection run prior to the test.
    除了书面报告以外,amtrak应当在试验之前,提交在最新的轨道几何形状检查中测得的轨道几何形状数据。
  • Verify dimensions and plumb of all elevator hoistways, prior to preparing shop drawings, and submit a written report to engineer detailing any proposed modification to suit the site conditions.
    编制施工图之前,校验所有电梯机井的尺寸和垂直度,并向监理工程师提交一份书面报告,详细说明任何根据现场条件拟作出的修改。